This blog will document the restoration of Cape Dory Typhoon (Weekender) Hull #1044. The Cape Dory Typhoon is a great sailing small-scale 'yacht', and offers a very friendly experience for her captain and crew. The scope of this restoration project will be painting the interior, deck and topsides, as well as fabricating new teak brightwork.

Tuesday, December 26, 2017

Aft Deck Hardware Layout & Drill-n-Fill / Foredeck Cleat / Continued Brightwork Fabrication

December 26, 2017


Well into the holiday break and back from a visit with family, I returned to working on Joule with full intention of a focused project wrap up by the end of January.  With the primer coats in place, I was ready to begin layout of the deck hardware.  To that end, the owner was able to swing by for a consultation on preferred layout, etc.  While waiting for this meeting, I went ahead and pulled the companionway hatch trim from the form.  I did get a bit of spring back, but the piece was easier to bend over the convex form of the hatch and will mate well with the stop trim that is mounted to the underside of the hatch.



Having discussed the hardware layout and usage with the owner, I resumed working the shop on the taff rail.  At this point, most of the new brightwork was in "rough" form.  My focus over the next few days will be to get the brightwork to a point of near completion so that I can dry-fit the various pieces of trim and joinery onto Joule prior to finish paint.  For the taff rail, I made a jig with a carpenter's rule to allow me to achieve a unified width from one side to the other.  I ran the jig on the aft portion of the rail and placed a pencil at the leading edge, tight against the jig, and ran that line along the rail. The shorter outboard ends would not allow the jig to transfer the line to the forward outboard ends of the rail, so to complete the curve I applied a batten along the penciled line to then extend it.  I removed this "excess" material, and hand-tuned it with a block plane and sanding work.  Due to the unevenness of the trailing edge of the poopdeck, I will need to remove some additional material on the taff rail, providing a consistent taff rail-to-deck appearance for installation.



With the taff rail in place, I laid out the location for the deck plate portion of the motor mount.



I continued to layout the aft deck hardware: starboard cleat, mainsheet cam cleat and standup block.  Upon close inspection, the original cam cleat was suffering severe cracking along one of the cams, and with a bit of pressure on it succumbed, and eventually broke.  I procured a new mainsheet cam cleat for Joule and continued with the layout process.



With the aft deck hardware marked, I went forward to drill and tap for the foredeck cleat fasteners.  Because I used G-10 fiberglass board for the replacement core material, I did not have to overdrive and fill in order to isolate balsa core from future water ingress; the G-10 board was also stronger solution for this important cleat.  I applied tape to the area and set the cleat in its final position.  I then marked the fastener locations onto the tape, removed the cleat and then drilled for 5/16" - 18 machine screws using a 17/64" drill bit.



With the holes drilled, I used the 5/16" - 18 tap to create the threads through the the fiberglass top and bottom skins, as well as the G-10 board.



The foredeck cleat is ready for installations - post finish deck paint.



I moved aft once again, and began to overdrive the marked fasteners holes for the poopdeck hardware.  I used a 1/2" forstner bit to open up the top skin and the core material.  I was careful to drill out the balsa core and not plunge through the bottom skin.   The overdrive process is used to isolate the future through-deck fastener from direct contact with core material that could be compromised with the presence of water.  Since the aft deck was cored with balsa, I chose to overdrive to protect the integrity of the deck.



The overdrive process is complete, time to move on to filling the holes.



I vacuumed the debris and detritus thoroughly, followed by a solvent wipe down, mixed a small batch of epoxy thickened mostly with 406 colloidal silica and applied to fill the holes.  The next step here will be to water-wash the amine blush, and then sand to fair with the surrounding deck surfaces.  Finally, I will drill and tap for machine screws, which will be bolted with backing plates from the underside of the deck.



With work on Joule complete for the day, I returned to the shop to continue fine-tuning the brightwork pieces.  I inserted the aft cockpit trim into the vice and dialed in its fair curve with a small block plane.



Satisfied with the fairness of the curve, both top and bottom, I ran the edges which would be exposed to eyes and hands through the router to cut 1/4" round overs.  I will not fully complete this piece of trim until the coaming boards are in place, or at least dry-fitted.



Reaching the end of what I could do with the aft cockpit trim, I turned to the companionway slide trim.  As I had done with the aft cockpit trim, I snuck up on final dimensions with a block plane, and then ran the upper edges through the router to give the trim piece 1/4" round overs.



The port slide hatch trim ~85% complete.



I repeated the process with the starboard trim - both port and starboard pieces shown below, ~85% complete.



Total Time Today: 6.5 hrs

Tuesday, December 19, 2017

3rd Coat Deck and Cockpit Primer + Companionway Slide Hatch

December 19, 2017

The day's first priority would be to sand the second coat of primer on the deck and cockpit, as well as the spot fill work that I had down to fair pinholes that were revealed through application of the last coat of primer, and then to get the third and final coat of primer on those surfaces.
To that end, I got straight to work with 150-grit sheet paper hand-sanding the fill areas (cockpit hatch gutters, recently patched navigation light openings in the cabin sides, and a few here-and-theres).



The gutters were challenging due to their fairly deep and tight widths, but alas I prevailed.  Below, I am tackling the port side molded gutter for the cockpit seat hatch.



With the port side complete, I moved over to the starboard side of the cockpit.



I faired a few spots on the seat and vertical surfaces, but the majority of the time and energy was spent on the seat hatch gutter.



With the cockpit faired smooth with sanding work, I moved forward to start at the bow and move aft, sanding the balance of the second coat of primer.



I vacuumed the majority of the sanding dust and then returned to the wood shop to prepare the primer paint.  With the 2-part Primekote paint portioned out, combined and mixed thoroughly, I set it aside for its 15-minute induction period.  While waiting through the induction period, I returned to Joule to wipe the surfaces with a solvent to capture any remaining sanding residue - always amazed at the amount of dust left on the surfaces even after a good vacuuming.



I started painting the third coat in the cockpit well and worked my way up to the vertical coamings and the aft surface of the cabin bulkhead.  I left the side decks unpainted and chose to move to the bow and work my way aft.



I painted the bases of the bow pulpit stanchions and the stem fitting with a foam brush, tipping the surface prior to moving onto the next.  With the 'cut-ins' complete, I once again used the foam roller to apply the primer to the field of the foredeck.



I moved aft and paint the cabin sides and cabin top, and finished with the side decks.  I had some paint left in the pot, so decided to sand and prep the companionway slide hatch by sanding and wiping down with solvent.  I cut-in with the foam brush on the rails of the hatch, and then switched to the foam roller for the top surface.  The don't see a need for additional coats of primer to any of Joule's surfaces above the waterline.  So, beginning on the weekend, I will begin to layout deck hardware (cleats, mainsheet block, motor mount, etc.) so that I can over-drill, fill with epoxy and drill and tap for fasteners.  The purpose of over-drilling and filling with epoxy is to isolate the new/old core from any future water ingress, thus preserving the structural integrity of the deck and the performance of the installed hardware.  In addition to the hardware, I will continue fine-tuning the new brightwork and gluing up the new toe and rub rails for eventual dry-fitting.



Total Time Today: 4.5 hrs

Sunday, December 17, 2017

2nd Primer Coat on Deck and Cockpit, Cont. Brightwork Fabrication

December 17, 2017


My first order of business was sanding the balance of the cockpit and the deck after the spot fill and fair work done over the last few days.  Since I need to get the second coat of primer on by this weekend, I sent straight to work hand-sanding all surfaces with 150 and 180-grit papers.  
With the sanding out of the way, and not to diminish the joyousness of the repetitive motion by giving but a sentence to it, I vacuumed the surfaces thoroughly and wiped the remaining dust with solvent applied to a couple clean shop rags.  The next order of business was to tape the remaining deck hardware not pulled from the boat: stem fitting, bow pulpit, and chain plates. 



With the chain plates isolated with tape,  I started to mix a batch of Primekote.



Waiting the required 15 minutes for the paints induction period, I used the time to sort out painting supplies - foam brush for cutting in tight spots, foam roller and paint tray.



Started painting from the inside out, or more precisely the cockpit floor, seats, aft cabin bulkhead, and then the decks from aft to foredeck.



I did cut in around the bow pulpit and in the higher radius corners.



With this application of the second coat, I discovered just a few areas showing pinholes.  I came back later in the work session to apply a thin coat of 410 Microlight to fill and fair these areas.



With my time on Joule finished for the day, I moved back over to the wood shop to continue working on the brightwork.  I set up a 1/2" straight bit on the router table to cut a rabbet into the underside of the both the toe and rub rails.  The rabbet would allow for plenty of space for polysulfide to help seat the rail, but also will allow for an additional water barrier.  I ran a scrap piece of teak over the router bit.  The scrap teak had the same width dimensions and confirmed that I had the fence set correctly.



Starting with the toe rails, I ran the two boards of both pairings over the router, holding the boards firmly against the fence.



The results were exactly what I was looking for, so I continued with the balance of the toe rails.



The starboard toe rail pairing after being run across the router table, cutting the 1/2" rabbet.



I then turned to the rub rails, and applied the same process.  The rub rails are also 3/4" in width dimension, so I did not adjust the router or fence.



The port rub rails showing their rabbets.  I will be putting a 1/4" roundover on the toe rails, but would do this just prior to gluing the pairings together.



 I bundled the toe rail pairings together once again and set them aside.  My next task was to complete the shaping of the cockpit seat trim so that I could steam bend them on the prepared form I had built.  I switched out the router bit for a 1/8" roundover and ran both pieces of seat trim across the router table.  I decided to use a 1/8" roundover on the underside of the trim, and then use a 1/4" roundover on the topside of the trim.  The 1/4" radius provide a bit more forgiving 'edge' as one takes and gives up their seat in the cockpit.



After completing the passes on the 1/8" roundover, I switched router bits and aligned the bit to cut the 1/4" roundovers.



Show below, both seat trim pieces ready for some steam.



I pulled out the steamer and started to bring the temperature up on the water.  While I waited for the steam, I 're-tooled' the companionway slide hatch trim to allow for a more severe arc.  Earlier, I had pulled the small piece of trim from its form and witnessed a lot of spring-back.  To get the convex curve I was looking for would require me to adjust the form to pull the ends into a greater arc.  As I completed this simple task the steam box was telling me it was ready for material.  I loaded the steam box with the companionway slide hatch trim and the two cockpit seat trim pieces.  



Effectively done for the day, I kicked back with a beer and NPR to enjoy the evening.  I left the pieces in the steamer for just over an hour.  I pulled the wet rag used to seal off the end, pulled out the small hatch trim, returned the rag to seal off the end, and then set the trim in the adjusted form.  With the small piece of hatch trim set, I went back to the steam box and pulled the two pieces of seat trim from their hot/humid environ and placed them on their form. Starting with the center-most form block, I pulled the trim pieces into the block with a clamp.  I continued this process, alternating from one side of center to the other until all clamps were in place.  



With that, I closed the shop for the day.




Total Time Today: 5 hrs