This blog will document the restoration of Cape Dory Typhoon (Weekender) Hull #1044. The Cape Dory Typhoon is a great sailing small-scale 'yacht', and offers a very friendly experience for her captain and crew. The scope of this restoration project will be painting the interior, deck and topsides, as well as fabricating new teak brightwork.

Saturday, November 4, 2017

Cabin Sole Recoring, Deadlights, and Miscellaneous Hatch Work

November 4, 2017


After a quick run up to the big box for a few odds and ends, I got to work on water-washing the amine blush off of the previously cured epoxy work on the cockpit locker lids and the companionway slide hatch.  Because today's work did not focus on the continuation of the hatches (nearly complete as they are), I dried off their surfaces and set them aside for later work.  I am in the early stages of getting primer on Joule - both deck and topsides - and so I needed to address any remaining items that stood in the way of that primer application.  Last week I was able to get the first coat of primer on the topsides, and as a result was able to protect the epoxy work from any UV degradation, but I also found a couple spots that needed some additional attention.  These areas are small, but nevertheless need to be addressed before any further primer coats are applied, or topcoat for that matter.  For today, my intention was to dry-fit the new Spartan deadlights, and this involved expanding the opening to receive the interior diameter of the frame.

I used one of the deadlights to create a template out of some leftover countertop laminate, and then applied the template to the cabin sides to outline the material to be removed.  I used this template to mark the new openings for both starboard and port.



Once I had my cut marks outlined, I grabbed my spiral saw and a newly purchased carbide bit to expand the openings to accept the new bronze deadlights.



After I had removed a majority of the material with the spiral saw, I then finished up with hand-sanding by using a sheet of 40-grit paper.  The new deadlights fit well and fit flush to the cabin sides.



I had taped a sheet of plastic on the interior to catch the fiberglass detritus as I cut the openings, and after having vacuumed up that dust and debris, I solvent-washed the openings to prepare for some fairing work.  



The coring had, at one time in the past, been addressed to prevent rot in the event that water made ingress.  Still, I had some fairing work to do after removing some of the interior and exterior laminate, so I painted out the surfaces with neat epoxy and then followed that with an application of thickened epoxy.  I will come back and fair these openings to then proceed with primer coatings, top coatings and eventual installation of the new ports.



The most significant project on the list today was to get to the installation of the new topskin for the cabin sole.  I also water-washed the previous work and dried all surfaces for the cabin sole.  I then sanded the surfaces with the RO Sander and an 80-grit disc, vacuumed the sanding dust and thoroughly wiped the surfaces down with a solvent to capture any remaining contaminants.

With the surfaces prepped for further work, I applied a sheet of plastic to create templates for the layers of fiberglass that would need to go down to complete the recoring work.



I split the top skin work into two sections: one, forward of the bilge access, and the second aft of the bilge access.  I cut three layers for both of these sections: two interior layers and one layer extending over the interior layers to tie in the tapered grinds of the surrounding original topskin.



I started off by wetting out the substrate, and then applied a skim coat of thickened epoxy to fill in any areas of significance.  With the surfaces prepped, I then laid down the first of two inner layers.  I then moved to wet this layer out with neat epoxy, and quickly followed with the second inner layer.  I finished the inner layer installations by rolling the glass out with a fin roller, removing air bubbles and ensuring good saturation as I went.

I followed the inner layers with the outer layer installation.  Like I had done for the previous layer, I saturated the glass with neat epoxy and rolled it out with the fin roller.  As a final task, I applied a skim coat of thickened epoxy to a portion of the topskin's weave and also filled a couple locations that required it.



Total Time Today: 6 hrs

Monday, October 30, 2017

First Coat of Primer: Topsides

October 30, 2017


After finishing up a late afternoon appointment, I raced home to prepare for Joule's first coat of primer for her topsides.  I removed the materials from a couple boxes - Interlux Primekote, a two-part epoxy primer to be used for the Interlux Perfection topcoat paint; and sorted the specific items for the task at hand.  

I combined parts A and B, and then set it aside to allow for the products induction period.  While the paint was chemically doing its 'thang', I went around Joule with rag and solvent to remove any last remaining contaminants.  At this time, I also taped off the stem fitting and chain plates.  



The last items taped off and the hull cleaned and ready for paint, the induction period had come to an end and so now it was time to begin painting.  I grabbed a 4" fine, solvent-resistant foam roller and a paint tray lined with plastic wrap and started at Joule's counter.  It always a pleasing to see the first coat of primer applied to a Cape Dory's counter...now that it had been freed of the hideous motor mount securely installed with no less than 8 bolts!  Joule's lines, as they were meant to be appreciated, were coming back!



I worked my way across the counter, down the starboard side, around the stem, and back down the port side.  Once I had completed the topsides I returned to the aft to apply a coat of primer on the poop deck.  My motivation for getting the first coat of primer on was two-fold: one, I wanted to get a UV protective layer of primer on the recent epoxy work, and two, I wanted to better isolate areas that required a bit more attention prior to applying those second, third and potentially fourth and final coats of primer.  I managed to get things completed just as darkness was settling in for the evening - happy to have this milestone reached.



Total Time Today: 1.5 hrs

Sunday, October 29, 2017

Completing Locker Lids & Prepping Topsides for Primer

October 29, 2017


Finally making my way into the shop - the weather is finally gorgeous in Florida! - I moved back onto the locker lids to complete their fabrication.  The day prior I had painted out the top and sides with a coat of epoxy as a sealer coat before I prime them with a two-part finish paint.  Today I went straight into creating what can only be described as miniature stringers for the underside in order to further strengthen them for adult use - though the owners of Joule are in superb shape and this is probably overkill, but...

I located a large teak dowel that had been loitering in my shop for quite a while - nearly 2" in diameter - cut it in half, and then again cut the two pieces lengthwise to create four half-moon shapes of roughly 8" in length.  I sanded the ends of the stringers into a taper that would allow for a layer of 1708 biaxial to more easily layover them.  I then arranged the stringers in a staggered pattern, two to each locker lid as can be seen below.



These supports will ensure that the locker lids see many seasons of use!  After having them arranged on the underside of the lids just as I liked, I then traced their outline to ensure I they found their proper home when time came to glue them in.



I removed the stringers and wet the underside of the locker lids out with epoxy.  As the undersides were tacking up, I cut four lengths of 1708 biaxial to cover and adhere them to the lids.  With the lengths of 1708 tape cut, I then mixed a batch of thickened epoxy (406 silica and 407 low-density filler) and applied a healthy amount within the boundary of the traced stringer locations.  I painted epoxy on the undersides of the stringers and firmly pressed them into position, squeezing the thickened epoxy out around the edges.  With a portion of a squeegee held to the underside of the lid and gently resting on the edge of the stringer, I created a fillet around the stringer.  I followed this process for each stringer.



After cleaning up the thickened epoxy from around the fillets that I had just created, I then turned to wetting the cloth out with epoxy.  I saturated both sides of each length of 4" 1708 biaxial tape, and then squeezed out the excess epoxy with a squeegee.  I then lifted the fiberglass into place, gently pressed into position with my fingers, and lastly rolled the glass out with a fin roller.



With the fabrication of the locker lids completed, I turned my attention back to Joule's topsides. Another goal for the day was to get a coat of protective primer on her topsides - protection for the recent epoxy work from the UV rays.  I sanded the spot-filled areas of yesterday after water-washing them to remove the amine blush and dried the surfaces.  I then wiped the topsides thoroughly with a degreaser agent to clean up any potential contaminants that I might of missed in previous cleaning.  After the surface was cleaned with the degreaser, I taped off the waterline.  With the waterline taped off, I wiped the surfaces down a second time with another solvent.  It was at this time that I realized painting would not be happening today despite my keen interest in it.  The day's gorgeous temperature was kept company by an equally gorgeous breeze - of which I am currently enjoying as I prepare this post!  I just would not have time to lay down a smooth application of primer since the wind would cause the paint to flash before the paint could be allowed to flow out to a nice smooth surface.  So, I now enjoy the balance of the day, an awesome fall breeze pushing through, and Joule is ready for her first coat of primer!



Total Time Today: 2 hrs