This blog will document the restoration of Cape Dory Typhoon (Weekender) Hull #1044. The Cape Dory Typhoon is a great sailing small-scale 'yacht', and offers a very friendly experience for her captain and crew. The scope of this restoration project will be painting the interior, deck and topsides, as well as fabricating new teak brightwork.

Sunday, August 20, 2017

Handy Work, Getting Into the Tight Spots

August 20, 2017



After catching up on various items around home and the shop, I set out to finish the deck and cockpit sanding as well as the interior.  The 5" RO sander could only get so far into some of the angles and corners - no matter how skillfully I feathered the edge in :), so the only thing left to do was to break out that go-to shop tool with unmatched capability for precision and finesse...the human hand.  On second thought, there are some hands out there that have more of a proclivity toward smashing and banging, but today my hands would require a measured approach.

I propped the fan up for a little circulation around Joule, flipped on NPR, and settled into finishing the removal of the old paint.  There would be plenty more sanding to come, between the new coats of deck, topsides and interior paint, but certainly not as grueling as this.  I worked my way around the cockpit, then into the cabin, and finished with the quarter berth and v-berth lockers.  It certainly feels good to get this arduous task behind me, and I look forward to the start of filling and fairing the numerous imperfections across Joule.

The last item for the day was to sand an area of the bottom skin on the poop deck, and then confirm the measurement for the new balsa core order - 3/8".  I will get a sheet of 3/8" balsa core on order for the poop deck this evening.   I have yet to cut open the cabin sole for similar recore work, and since I did not know if the 3/8" balsa was laid up on there as well, I decided to wait to order until I had the sole opened up. 




Total Time Today: 3.5 hrs

Saturday, August 19, 2017

Interior Sanding

August 19, 2017


After completing some extended work travel - my 9-to-5 work - I was eager to get back on Joule and continue the restoration work.  The goal for today was to complete the interior sanding, or at least get close to it.  I started by removing the quarter berth and v-berth trim and hatches, labeling them and setting them aside.




The tool for the day was my 5" RO sander, with the vacuum hose connection.  I began the sanding task with the starboard quarter berth, gaining access through the starboard cockpit locker.  


Using 80-grit paper, I made my way from the aft portion of the fiberglass liner to was far forward as I could.  The tool's profile limited my ability to get close to the inboard stringer supporting the cockpit floor, but tight areas like these will be addressed by hand. 


I flipped over to repeat the task on the port side, again gaining access through the cockpit locker.


Coming down below to get access to areas that I could not from above, I also chose to sand the fiberglass roving making up the walls of the cockpit well.  The unfaired roving, shown as a blue-gray, will likely be painted with a product similar to Interlux Bilgekote.  These areas of unfaired glass work, essentially every surface that is NOT part of the fiberglass liner, will be painted with this Bilgekote product.


Next, I worked in a counterclockwise fashion tackling the balance of the interior and overhead.  I adjusted the vacuum hoses and power cords to get going on the forward section of the starboard quarter berth. The red surfaces shown in the photo appears to be some sort of fairing compound spread on top of fiberglass patches.   In fact, there appeared to be two or three separate fairing or filling materials applied to these patches surfaces. 



The photo below reveals areas on the liner that received fiberglass work.  I sanded the paint and fairing compounds down to remove severe cracking and flaking paint.  Either the glass work was not done properly, or there is so much flex in the liner that over time the paint failed.  I am pretty sure it is the former, and so I will take care to properly prep for paint in the near future.



Additional, previous glass work can be seen below.



I then slid forward and began to tackle the v-berth.



The interior of the hull, just visible through the v-berth lockers, was also sanded as much as possible. The RO sander was able to get access to significant surface area below, but there will be some hand sanding for me throughout all of the lockers.



With the RO sander, I managed to get at 99% of the surface area forward.



Continuing on the counterclockwise motion, I moved over to the port midships and quarter berth areas.  By this time, I pretty much could spot the areas on the liner that had received glass work - poor workmanship at that.  All areas on the liner that were addressed with "glass work" were showing major paint failure.



I worked my way aft on the port side.  At this time, I also worked the overhead and paid the price for waiting so long to tackle it - arms and shoulders were beginning to fall off at this point!



Just visible below, the area of the liner that had received fiberglass work.  The smooth fiberglass liner will likely receive something like Pettit's EZ-Poxy product.  This one-part polyurethane is an impressive option for interior boat paints, as is simple to use given the 'one-part' aspect.



With port side complete, I had just the areas left for hand sanding work, which I hope to complete in the next session.  I did not sand the cabin floor since I plan to to some recoring work here, and sanding would prove a pointless venture - kind of like bringing up politics at Thanksgiving dinner ;)



Total Time Today: 7.25 hrs

Sunday, August 6, 2017

Topsides Sanding (Part 2) & Deck Core Work

August 6, 2017


Because I wanted to complete the topsides sanding today, I began with removing the plastic thru-hull fitting for the bilge pump, located roughly amidships.  


The 1/2" interior diameter thru-hull extended through the topsides and interior fiberglass liner, and was then secured with a plastic backing nut.  


I applied a wrench to the backing nut, and with some light pressure it began to release from the thru-hull fitting.


After the backing but was removed, I applied a hammer to the thru-hull fitting itself in order to free it from the 'marine goo' it was bedded in.


A few taps, and then a wrench from the exterior of the boat, and the thru-hull was out.  The owners of Joule have requested a new bronze thru-hull fitting for the bilge.  


With no obstructions on the topsides from bow to stern, I set up the porter cable 7335 with dust shroud and connected it to the shop vac.  AS I had done yesterday, I used 40-grit PSA pads to remove the layers of paint and primer, taking things down to the original gelcoat.


I worked my way aft, leaving just a inch worth of material at the waterline.  I would come back later and hand-sand the waterline. 


Additionally, I will be using a combination of hand-sanding and the palm sander for the bow.


With the topsides nearly completed, I turned back to the poop deck to rid it of the problem areas (i.e. wet core).  In my original evaluation of the boat, I sounded the poop deck and found no discernible  problem areas - typically highlighted by a deep, hollow thud as one taps on the deck.  It may have been the sheer number of hardware items installed on the deck; nevertheless, there is wet core in the poop deck.  I started with the motor mount base plate.  The CD Typhoons originally came with a folding motor mount, and this one had signs of a re-installation - I found fastener holes that had been filled with a thickened epoxy.  I drew cut lines on the deck, and removed the top skin with a Bosch oscillating tool.  I removed enough material to rid the deck of wet core in this area.


I began to sound the deck to identify the areas of issue, and decided to extend the previous day's cut forward to include those areas that held the main sheet cam cleat and stand up block.


With this area clear of deteriorated core, I found more issues with the original aft cleat location.  I marked cut lines and removed the top skin.


As expected, I found wet core with the initial cut.  I then extended my cut toward the starboard rail to get all of the bad areas removed.


I ended up with clean, dry core.


Most of the core in the aft deck was at one point sopping wet, but then had deteriorated and then dried out.  I did find a lot of water in the core around the aft cleat.  Next steps here will be to grind tapered edges to tie-in the new glass, install new core material, apply a new fiberglass top skin, and fill and fair.



Total Time Today: 5 hrs